| |
| |
Client |
| |
General Direktorate of State Hydraulic
Works |
| |
|
| |
|
| |
Diversion Tunnels |
| |
2 units 8,5m inner diameter, 1981m total
length |
| |
Access Tunnels |
| |
2 units 11m inner diameter, 2212m total
length |
| |
Access Tunnels to Dam Crest |
| |
2 units 7,2m inner diameter, 735m total
length |
| |
Excavation |
| |
375.000 m3 |
| |
Concrete works |
| |
65.000 m3 |
| |
Road construction |
| |
4.000 m |
|
|