| |
| |
Client |
| |
Göltaş Enerji Co. Inc. |
| |
|
| |
|
| |
|
| |
|
| |
Partnership |
| |
Ataç %50, Alke %50 |
| |
Concrete Gravity Dam |
| |
102m Length, 44m Height |
| |
Diversion Canal |
| |
6mx6m Cross section, 173m Length |
| |
Headrace Tunnel |
| |
Diameter 3,6m, Length 2619,0m |
| |
Tailrace Tunnel |
| |
Diameter 3,6m, Length 520m |
| |
Councrete |
| |
108.219 m3 |
| |
Tunnel Councrete |
| |
37.212m3 |
| |
Rock Bolts |
| |
36.312 kg |
| |
Trashracks and Gates |
| |
191.261 kg |
|
|