  EŞEN 2ND DAM & HYDROELECTRIC POWER PLANT
     
 
  Client
  Göltaş Enerji Co. Inc.
   
   
   
   
  Partnership
  Ataç %50, Alke %50
  Concrete Gravity Dam
  102m Length, 44m Height
  Diversion Canal
  6mx6m Cross section, 173m Length
  Headrace Tunnel
  Diameter 3,6m, Length 2619,0m
  Tailrace Tunnel
  Diameter 3,6m, Length 520m
  Councrete
  108.219 m3
  Tunnel Councrete
  37.212m3
  Rock Bolts
  36.312 kg
  Trashracks and Gates
  191.261 kg