Client |
| |
General Direktorate of State Hydraulic Works |
| |
|
| |
|
| |
|
| |
|
| |
Installed Capacity |
| |
3x54.2 mw |
| |
Tunnel Excavation |
| |
435.000 m3 |
| |
Concrete Works |
| |
281.900 m3 |
| |
Penstock |
| |
4.514 tons |
| |
Steel gates construction |
| |
173 tons |
| |
Headrace Tunnel |
| |
5.6m inner diameter, 8150 m length |
| |
Access Tunnel |
| |
1100m length |
| |
Surge Tank |
| |
70m depth, 10m diameter |
| |
Power House Cranes |
| |
25, 30, 50, 150 tons |
| |
Road Construction |
| |
26 km |
|
|