  GEZENDE DAM HYDROELECTRIC POWER PLANT
     
 
  Client
  General Direktorate of State Hydraulic Works
   
   
   
   
  Installed Capacity
  3x54.2 mw
  Tunnel Excavation
  435.000 m3
  Concrete Works
  281.900 m3
  Penstock
  4.514 tons
  Steel gates construction
  173 tons
  Headrace Tunnel
  5.6m inner diameter, 8150 m length
  Access Tunnel
  1100m length
  Surge Tank
  70m depth, 10m diameter
  Power House Cranes
  25, 30, 50, 150 tons
  Road Construction
  26 km