Client |
| |
IIrrigation of 4th Stage Malatya / Akçadağ |
| |
|
| |
|
| |
|
| |
|
| |
Concrete Lined
Primary Canal |
| |
16 km |
| |
Concrete Lined Secondary Canal |
| |
82 km |
| |
Concrete Lined Tertiary Canal |
| |
94 km |
| |
Discharge Canal |
| |
15 km |
| |
Operation Roads |
| |
80 km |
| |
Turnouts |
| |
51 ea. |
| |
Bridges |
| |
22 ea. |
| |
Overchutes and water intakes |
| |
36 ea. |
| |
Syphons |
| |
160 m |
| |
Chutes |
| |
1045 m |
|
|