| |
| |
Client |
| |
General Direktorate of State Hydraulic
Works |
| |
|
| |
|
| |
|
| |
|
| |
Concrete Lined
Primary Canal |
| |
40 km |
| |
Concrete Lined Secondary Canal |
| |
36 km |
| |
Concrete Lined Tertiary Canal |
| |
73 km |
| |
Discharge Canal |
| |
25 |
| |
Drainage Canals |
| |
73 km |
| |
Turnouts |
| |
120 ea. |
| |
Bridges |
| |
38 ea. |
| |
Tunnels (with 2.40m. diameter) |
| |
2400 m |
| |
Syphons (with 1.60m. diameter) |
| |
160 m |
|
|